Progress Report #2

I will be making several reels this winter of the design shown on this blog 10 Aug 2011. But I am producing them 2 at a time so the work is less repetitive. Here are frames and spools for the first two “production” reels.

Next comes finishing: sanding, tumbling, and anodizing the aluminum. Then make the click and crank parts.

This entry was posted in My Reels. Bookmark the permalink.

1 Response to Progress Report #2

  1. jim royston's avatar jim royston says:

    Beautiful work Dave. I check your blog periodically to see the progress.
    Regards, Jim

Leave a comment